Ozone-Bioxyplasma STP & ETP

Team Waterhouse, Ozonepedia

Make PROFITABLE Sewage Treatment Systems, at
lesser capital costs,drastically lesser space
Lowest running costs
and Nil hassles of conventional maintenance!!!

USE METHODICAL OZONATION cum BIO-OXYGENATION AT RAW STAGE!



Treat Sewage like its 2024 AD.
Not like 1924 AD!


STP and ETP

PATENTED TECHNOLOGY


FORMALLY GUARANTEED TREATED WATER PARAMETERS :

O&G - less than 10
BOD - less than 10
COD - less than 30
Ammoniacal Nitrogen - less than 25
Total Kjeldahl Nitrogen - less than 50
Total coliform - less than 50
Colour - Colourless, becomes completely transparent after filtration
Odour - Fully Odourless
and many more, including pH, NOx, total phosphorus, free ammonia, etc.


Few Actual site videos of Ozo-Bioxy STPs
(find other site images & Test Report from actual site in catalog attached) :

Methodical OZONATION cum BIO-OXYGENATION of Raw Sewage :
https://tinyurl.com/3fhfcvj5

Recirculation of Raw Sewage :
https://tinyurl.com/mr29d7fk

Full treatment plant with tanks :
https://tinyurl.com/2bdffb9r

Full treatment plant with tanks :
https://tinyurl.com/2ew2wty6

Clean, raw sewage after OZONATION cum BIO-OXYGENATION even before Filtration :
https://tinyurl.com/2v5t4ncj

Clean, Final Treated sewage water :
https://tinyurl.com/3fkbwdu9


The general List of electromechanical equipment are as follows :

Bar Screen O&G Trap (optional, as per project need)
TWH-make, Patented, Ozonation cum Bio Oxygen Plasma system, for Raw Sewage treatment
Water chiller for cooling the Ozo-Bioxy system, and prevent drainage of cooling water (Optional, at extra cost)
Agitator inside the contact tank for proper mixing
Transfer pump from Collection to Ozone-mixing - 1W &1S
Ozone Re-Circulation pump - 1W &1S
Filter-Feed Pump - 1W &1S
Filtration systems : MGF & ACF
CPVC Pipelines & Fittings
Electrical Control Panel


The End User’s Scope are as follows :

    The civil requirements to be done by the end-user are :
  1. Collection Tank, Ozone-Mixing Tank, Filter Feed Tank
  2. Treated water tank (Optional)
  3. Bar Screen chamber / O&G Chamber
  4. Other requirements under the scope of end-user are :
  5. Electrical power supply for pumps, Ozonation equipment & oxygen feed for ozonation
  6. Shaded area for the STP, especially 30-50sq.ft for the Ozonation cum Bioxy system, for protection against rainfall and direct sunlight.
  7. Base for Pumps & Ozonation system.
  8. Pipelines upto the STP
  9. Power lines and water line should be ready during installation of STP.

For project implementations, we need the following technical information

  1. Capacity of sewage treatment plant to be set up, like in m3/hr or KLD, MLD, etc
  2. Raw Sewage BOD, COD & TSS levels, in ppm



Enquire Now